Triyono, Aluisius and Rochmadi, Budi and Dwiastuti, Erwin and Effendy, Tuty (2011) Economic Pre-Feasibility on Processing Monazite as By-Product Mineral From Tin Mining at PT Koba Tin. Project Report. Sekolah Tinggi Manajemen IPMI, Jakarta Selatan. (Unpublished)
Image
413_Economic Pre-Feasibility on Processing Monazite as By-Product Mineral from Tin Mining at PT Koba Tin.pdf Restricted to Registered users only Download (39MB) |
Abstract
Group Field Project (GFP) is one of the requirements for obtaining the Master Degree at IPMI. Our GFP focuses on pre-feasibility study of processing monazite into Rare Earth Element (REE). Our aim is to provide an alternative business for PT Koba Tin (PTKT) in extracting by product mineral Monazite into REE with higher value added. PTKT presently operates under a Contract of Work (Cow) with the Indonesian government for a total area of 41,680. The CoW will be expired by 2013 and verbally will be granted for additional 10 years extension under IUP (Ijin Usaha Pertambangan - Business Mining License). However, under IUP mining concession will be limited into maximum 25,000 Ha which is estimated to produce around 150,000 to 180,000 M3 ore (source: interview with various stakeholders). Such resource will worth of refined tin of 35,000 to 50,000 tons. With lower production volume expected, PTKT is pressed to find alternative source of income to remain profitable.
Item Type: | Monograph (Project Report) |
---|---|
Subjects: | H Social Sciences > HB Economic Theory H Social Sciences > HG Finance |
Divisions: | Library > GFP (Group Field Project) |
Depositing User: | Dwi Selviyana |
Date Deposited: | 22 Jan 2020 02:03 |
Last Modified: | 22 Jan 2020 02:03 |
URI: | http://repository.ipmi.ac.id/id/eprint/518 |
Actions (login required)
View Item |