Sidqi, Jalu Basudibyo (2024) Capital budgeting analysis for turbine machines of microhydro power plant and its non-monetary considerations : a case study of microhydro power plant st Cibuni west java for period 2023-2033. Graduate thesis, Sekolah Tinggi Manajemen IPMI.
Text
Cover--Abstrak - Jalu Basudibyo Sidqi.pdf Restricted to Registered users only Download (816kB) |
|
Text
Chapter 1 - Jalu Basudibyo Sidqi.pdf Restricted to Registered users only Download (773kB) |
|
Text
Chapter 2 - Jalu Basudibyo Sidqi.pdf Restricted to Registered users only Download (549kB) |
|
Text
Chapter 3 - Jalu Basudibyo Sidqi.pdf Restricted to Registered users only Download (487kB) |
|
Text
Chapter 4 - Jalu Basudibyo Sidqi.pdf Restricted to Registered users only Download (946kB) |
|
Text
Chapter 5 - Jalu Basudibyo Sidqi.pdf Restricted to Registered users only Download (237kB) |
|
Text
References - Jalu Basudibyo Sidqi.pdf Restricted to Registered users only Download (340kB) |
Abstract
Electricity has long been a major component of the economy in Indonesia. In south east Asia, Indonesia has a tremendous with 3.643 gigawatt sources of renewable energy for building a power plant. One of the sources is hydro energy, the micro hydro power plant in Cibumi, West Java. The project was carried out by PT. Tirta Mukti Lestari (PT. TML) for the period of 2023-2033. The purpose of the study was to determine financial feasibility, to evaluate sensitivity and to analyze the non-monetary impact of selecting a Germany or China Turbine machines. The study was use mixed methods; strategic analysis of SWOT and porter Five forces theories and capital budgeting model indicators: payback period (PP), discounted payback period (DPP), return on investment (ROI), net present value (NPV), NPV Index (PI), internal rate of return (IRR), and weighted average cost of capital (WACC), and using sustainable development goals to analyze the non-monetary factors. The findings showed that Germany turbine was selected as the most effective turbine with 5 year PP, 7 year DPP, Rp. 17.047.331.318 NPV, 33.23% PI, and 14.63% IRR with yearly ROI > 8% WACC. On the other hand China turbine had 4 year PP, 7 year DPP, Rp. 24.571.564.716 NPV, 59,7% PI, and 19,55% IRR with yearly ROI> 8% WACC. This project related to SDG number one & thirteen and sensitivity analysis showed if sales decrease 10% NPV of this project is positive for both the Germany turbine and the China turbine.
Item Type: | Thesis (Graduate) |
---|---|
Subjects: | H Social Sciences > H Social Sciences (General) |
Divisions: | Thesis > Master of Business Administration |
Depositing User: | Dwi Selviyana |
Date Deposited: | 10 Jul 2024 04:22 |
Last Modified: | 10 Jul 2024 04:22 |
URI: | http://repository.ipmi.ac.id/id/eprint/2524 |
Actions (login required)
View Item |